I will post the activities of the workers when re-installing the seawater pump which is then used to cool the turbine engine in the PT. Perta Arun gas refinery.

This activity involves land and sea vehicles as well as divers, initially the pump engine is transported using a trailer and placed on a barge boat using a crane at the port, then the barge boat carries the pump engine to a sea water pump called the sea water intake here also the main function of the crane to take the pump from the barge and then place it in position.

This is the portrait of the job that I have captured, dangerous work like this prioritizes safety because the main motto at work is zero incidents.